LOADING

Please wait...

Click anywhere to begin

Welcome to A.T. YUCHENGCO CENTRE

A.T. YUCHENGCO CENTRE (formerly RCBC Savings Bank Corporate Center) is a 34-storey building located in the center of Bonifacio Global City.

ANNOUNCEMENT
Voluntary Wearing of Face Shield under Alert Level 2
Dear Tenants,

A memorandum was released by the Executive SecretaryOffice of the President of the Philippines last night, November 15, 2021, regarding protocols on the use of face shields.
 
With this, the Property Management Office (PMO) will adhere to the memorandum and the wearing of face shield inside the premises of A.T. Yuchengco Centre (ATYC) will be voluntary effective immediately.
 
Furthermore, we are still awaiting the official announcement from the Local Government of Taguig where ATYC falls under its jurisdiction. This is in accordance to what is stated in the memorandum that LGUs shall have the discretion to mandate the use of face shields.
 
For your proper guidance and dissemination.
 
Please see attached file for your reference.
 
Should you have any clarification, feel free to contact us at (02) 8808-1770.
 
Repainting Works at 2F Loading Dock
Dear Tenants,

This is to inform you that the Property Management Office will resume the second phase of the repainting works of 2F Loading Dock tomorrow, November 26, 2021 at 8PM until December 1, 2021 at 5AM.
 
During the activity, we might close some areas of the driveway and divert your access with the assistance of our security personnel leading to Podium Parking Levels. We also suggest that all bulk deliveries at Loading Dock must be arranged ahead/after the scheduled repainting activity.
 
We are looking forward for everyone’s cooperation for us to execute this activity properly and timely. We apologize for the inconvenience it will cause at your end.
 
Please see attached file for your reference.
 
For any clarification, feel free to call us at (02) 8808-1770.
Replacement of Water Meter
Dear Tenants,

Please be informed that Manila Water will have a scheduled water interruption tomorrowTuesday, October 26, 2021 to give way for the emergency repair and replacement of the building’s existing water meter. The activity will start at 10am and expected to be completed at 12noon of the same day.
 
This activity will have no impact in the supply of water in our building and would still be available while the repair is on-going.
 
However, the ramp going to basement parking will be affected and temporarily would not be available while repair is on-going since the work area is directly located at the ramp.
 
All authorized parkers at the basement parking, prior entering basement parking, will be asked if they need to go outside of the building during the covering period. All authorized parker that will answer “YES” and that needs or might go out of the building between 10 am to 12 noon will be diverted and assisted in the podium parking of the building. Our Security personnel will be deployed and available to assist those authorized parkers.
 
We are sorry for this inconvenience and rest assured that the Property Management Office will closely monitor this activity.
 
Attached is the letter from Manila Water for our common reference.
 
For any clarification, feel free to call us at (02) 8808-1770
 
Thank you,
Christmas Decorations Guidelines

Dear Tenants,

 

It is again the time of the year and Holiday season is fast approaching. During this holiday season, decorating homes and businesses is a long-time tradition. Unfortunately, these decorations increase the chances of fire. ln order to ensure a safe and delightful Holiday season for everyone, all tenants of A.T. Yuchengco Centre must adhere to the following:

 

1. All decorations must not block or cover any part of the CCTV, Fire Alarm and Sprinkler System. Cameras, Fire Extinguishers, Emergency Lights, Exit Lights, Hallway lighting leading to exits must not be covered. Exits must not be blocked or hidden.

2. Inspect and test all electrical decorations for any damage before use. It should passed the standards and with mark of PS (Philippine Standard), ICC (International Certificate of Competence) or equivalent. Cracked or damaged sockets, bare wires and loose connections may cause a serious shock or can start a fire. Never attempt to fix the faulty lights, replaced them.

3. Do not overload electrical outlets. Never connect more than three strings of lights. More than three strands may not only trip a circuit breaker, but can also cause fire.

4. Protect electrical cords from damage. To avoid shock or fire hazards, cords should never be pinched by furniture, forced into small spaces such as doors or windows, placed under rags, located near heat sources or attached by nails or staples.

5. Do not place extension cords where they could cause a tripping hazard, like doorways, hallways and exits.

6. Do not mount or support light strings in a way that it might damage the power cord’s insulation.

7. Keep hallways, stairs and doorways properly illuminated and free of clutter and other objects that could hinder an escape during an emergency.

8. Turn off and unplug all decorations when leaving your workplaces or stores.

9. Do not use electrical ornaments or light strings on the artificial trees with metallic leaves or branch coverings. This might damage the cord’s insulation and cause electrical shock.

10. Avoid using sprinkler heads, smoke detectors, acoustic ceiling boards and T-runners to hang your decorations.

11. Never use an open flame or candle in your decorations and avoid placing any liquid near your electrical sources.

12. Know the locations of Fire Extinguishers.

 

Kindly disseminate information to all concern personnel within your business units.

Thank you for the usual support and cooperation.

 

For any clarification, feel free to contact us at (02) 8808-1770.

 

Kind regards,

Repainting Works - 2F Loading Dock
Dear Tenants,

This is to inform you that the Property Management Office will start the repainting works of 2F Loading Dock tonight, October 29, 2021 at 8PM until November 1, 2021 at 10PM.
 
Phase 1: October 29, 2021 (8PM) until November 1, 2021 (10PM)
Phase 2: November 5, 2021 (8PM) until November 7, 2021 (10PM)
 
                 
 
During the activity, we might close some areas of the driveway and divert your access with the assistance of our security personnel leading to Podium Parking Levels. We also suggest that all bulk deliveries at Loading Dock must be arranged ahead/after the scheduled repainting activity.

We are looking forward for everyone’s cooperation for us to execute this activity properly and timely. We apologize for the inconvenience it will cause at your end.
 
Please see attached file for your reference.
 
For any clarification, feel free to call us at (02) 8808-1770.
September Pest Control

Dear Tenants,

 

Please be advised that the monthly pest control activity for the month of September is scheduled on September  24 & 25, 2021.

In connection with this activity, we are requesting assistance to access your office floors. Please see attached corresponding schedules per area.

PMO will oversee the service provider while conducting the said activity.

If the tenant refused treatment upon arrival of technicians despite their confirmation, a mobilization fee of Php 100.00 will be charged to the tenant to cover the cost of labor and transportation.

Furthermore, the Statement of Accounts (SOAs) will be sent to your respective offices on a later date.

 

Thank you.

Building Disinfection (October 2021)

Dear Tenants,

 

On Saturday, October 2, 2021, A. T. Yuchengco Centre will conduct disinfection of the building common areas. Areas within the building covered by the disinfection includes main lobbies, hallways, fire exits, elevator car lifts and lobby areas, male and female comfort rooms, machine room, AHU rooms, electrical rooms, and PMO offices.

The activity will start at around 10am and will be conducted by our service partner, Buildtime Contractors Corporation (Fog2Zero). Estimated time for the disinfection process of all the building common areas to be completed is at around 6pm of the same day.

The disinfection process will be a combination of wiping of high contact surfaces with disinfectants, UV and steam sterilization, and dry fogging.

We would also like to remind all of our tenants to conduct their own regular disinfection at their leased area.

Let us all work together to stop the spread of any disease and maintain our building a safe work place for everyone.

For any clarification, feel free to call us at (02) 8808-1770.

 

Kind regards,

Maintenance of Service Elevator

Dear Tenants,

 

At 2PM today, Service Elevator will be temporarily unavailable to give way for its emergency repair. The repair should be done immediately and can no longer be delayed for safety reasons.

Duration of the repair will take until midnight of Sunday, October 3, 2021. After which, routine safety inspection will be conducted to ensure that the elevator car lift is at its best possible working condition for the safety of all its passengers. On Monday, October 4, 2021, Service Elevator is expected to be operational.

Also, starting tomorrow, Saturday, adjacent car lift (Executive Elevator) needs to be parked and non-operational as well for safety reasons.

While the 2 elevators (Service and Executive elevator) are not operational, PE 4 and 7 will be manually operated serving both YGC and non-YGC floors with schedule as follow:

PE 4 (Executive Elevator) - whole day; from October 2 to 3

PE 7 (Service Elevator) - starts at 2PM today until October 3

Sorry for the inconvenience and rest assured that we are closely monitoring the activity as we value the safety of all elevator passengers.

Thank you for your understanding and usual support.

For any clarification, feel free to call us at (02) 8808-1770.

 

Kind regards,

New QR Code Contact Tracing App

Dear Tenants,

 

Threat of the COVID-19 is still out there and with the presenceof the new variant which is more contagious, the Property Management Office has adapted to the Quick Response (QR) code contact tracing application developed by StaySafe.ph for faster and more effective means ofdoing thecontact tracing. This is also part of the building’s compliance with the Local Government of Taguig with regards to COVID-19 protocols by usingStaySafe.ph as contact tracing app. The QR codes are already availableand posted on all entry pointsfor all the building occupants, employees, clients and visitors who wish to enter A.T. Yuchengco Centre.

 

To accomplish the contact tracing form, all individuals must follow thesesimplesteps:

              1.Using your mobile phone, open the camera or any QR code scanner appand scan the QR code posted on entry points of the building.

              2.A link will pop up and you must click the link so youwill be redirected to the web-based form.You must have your mobile internet connectivity for this to work.

              3.In the web-based form, fill outcompletely and honestlythe health survey and profile form.

              4.Present the duly accomplished and submitted formtothe Security Personnel on duty.

              5.In case you don’t have access to mobile internet connectivity, ahard copy of the Health Checklist Form is available.

Attached is the QR code for reference.We hope for your understanding and cooperation as we upgrade our existing preventive measures to keep our building and its occupants safe and secure.

For any clarification, feel free to call us at (02) 8808-1770.

Kind regards

October Pest Control

Dear Tenants,

Please be advised that the monthly pest control activity for the month of Octoberisscheduled on October8 & 9, 2021.

In connection with this activity, we are requesting assistance to access your office floors. Please see attached corresponding schedules per area.PMO will oversee the service provider while conducting the said activity.

If the tenant refused treatment upon arrival of technicians despite their confirmation, a mobilization fee of Php 100.00 will be charged to the tenant to cover the cost of labor and transportation.

Furthermore, the Statement of Accounts (SOAs) will be sent to your respective offices on a later date.

Kind regards,

3rd Quarter Nationwide Simultaneous Earthquake Drill

Dear Tenants,

 

The National Disaster Risk Reduction and Management Council (NDRRMC) announced yesterday thru Memorandum no. 97, s.2021 the new schedule of the 3rd Quarter Nationwide Simultaneous Earthquake Drill (NSED) which will be held tomorrow, September 16, 2021, Thursday at 8:00AM.

A.T. Yuchengco Centre will participate by playing an announcement thru the building’s public address system to encourage everyone to participate and perform the "DUCK, COVER & HOLD" position once the event started. Full evacuation drill will not be conducted to minimize business impact.

For those who will participate and perform the duck, cover and hold position, kindly take photos of your workplace showing all the participants and share it to us by sending it to our helpdesk email at helpdesk.atycpmo@landev.com.ph for documentation purposes.

Attached is the notice from BGCEA for our common reference. We are looking forward in an increased in no. of participants from the last quarter’s event.

 

For any clarification, feel free to contact us at (02) 8808-1770.

Thank you.

Repair of Gensets Power

Dear Tenants,

On Sunday, September 19, 2021Emergency Power of the building will be temporary unavailable starting at 9am until 6pm of the same date.

This is to give way for the repair of the power cables of Genset no. 2 connected to the building’s emergency power. The temporary shutting OFF of the emergency power is needed for safety related concerns.

For the duration of the activity, there is no scheduled power interruption as confirmed with Meralco that might affect the supply of power of our building.

With this, may we ask for your early preparation such as shutting down, backing-up of your critical loads, if possible, as a precautionary measures.

We apologize for the inconvenience and rest assured that we are closely monitoring the activity and our service partners are present in the activity.

Thank you for understanding and usual support.

For any clarification, feel free to call us at (02) 8808-1770.

 
Thank you.
ATYC Community Sharing
Dear Tenants,

A.T. Yuchengco Centre will conduct Community Sharing that will benefit our service partners within our building particularly our housekeeping personnel, security personnel, messengers, food servers, cashiers and maintenance personnel. By doing this, we can show our heartfelt appreciation for their continuous service especially during this challenging time.
 
With this, we are knocking on your generous hearts to support the activity and to give based on your capacity to share.
 
The schedule for the collection of goods will start from June 7 until June 11, 2021. The goods that can be shared are fruits, veggies, coffee/tea, noodles, pasta, rice, bread, biscuit, sandwich spread, condiments, egg, dairy, medicine, vitamins, toiletries and etc.
 
 
We will provide boxes located at main and back lobbies, and outside the building along perimeter of 26th and 25th St. near the entrances to accommodate the goods that will be dropped off.
 
The actual day for the community sharing will be on June 15, 2021.
 
We also accept cash donations via RCBC Discartech: Account number: 0001-0000677433-7 and we will assure that cash donations will be accounted for accordingly.
 
 
For any concern, feel free to call us at (02) 8808-1770.
 
 
 
“Remember that the happiest people are not those getting more, but those giving more.”
 
Manual Load Dropping
Dear Tenants,
 

Today, June 02, 2021, National Grip Corporation of the Philippines (NGCP) implemented Manual Load Dropping (MLD) due to limited available generating capacity across Luzon Grid. By doing this MLD, NGCP will maintain the integrity of the power system and ensures continuous transmission of power across Luzon Grid. Please see the daily power supply situation update below.
 
 
 
The Tentative MLD schedule for our building today is from 1pm to 3pm. Once the MLD push thru today, we will operate our building generators to continue the supply of power in our building. Two (2) instance of short power interruption will occur during the transition of power from Meralco to Emergency and vice versa.

To know more about the Manual Load Dropping, please visit the links provided below.
 
https://company.meralco.com.ph/news-and-advisories/why-are-we-experiencing-rotating-brownouts
 
 
Please see attached file for your reference
 
For any clarification, feel free to call us at (02) 8808-1770.
2nd QUARTER NATIONAL SIMULTANEOUS EARTHQUAKE DRILL
Dear All,
 
 
Please see attached file for the Sequence of Event and Recorded public address of 2nd QUARTER NATIONAL SIMULTANEOUS EARTHQUAKE DRILL, for tomorrow June 10, 2021, Thursday at 9am.
 
June Pest Control

Dear Tenants,

 

Please be advised that the monthly pest control activity for the month of June  is scheduled on June 25 & 26, 2021.

In connection with this activity, we are requesting assistance to access your office floors. Please see attached file for the schedules time at your area.

PMO will oversee the service provider while conducting the said activity.

If the tenant refused treatment upon arrival of technicians despite their confirmation, a mobilization fee of Php 100.00 will be charged to the tenant to cover the cost of labor and transportation.

Furthermore, the Statement of Accounts (SOAs) will be sent to your respective offices on a later date.

 

Kind regards,

Renovation of GF and 2F Restrooms

Dear Tenants, 

This is to inform you that the Property Management Office will start its renovation works on Ground and Second Floor Restrooms. The activity will be completed in approximately two (2) months and the affected restrooms will be closed on the following dates: 

 

Start Date 

Completion Date 

Available Restrooms for Use 

 

  2F Restrooms 

 

June 26, 2021 

 

July 31, 2021 

2F Restrooms will be closed during this period. GF Restrooms are available for use. 

 

  GF Restrooms 

 

August 1, 2021 

 

August 31, 2021 

GF Restrooms will be closed during this period. 2F Restrooms are available for use. 

 

Rest assured that the execution is of least effect. Interval of cleaning in the areas affected will be also increased. 

 

For any clarification, feel free to call us at (02) 8808-1770. 

 
Thank you.
Building Disinfection

Dear Tenants, 

On SundayJune 27,2021, A. T. Yuchengco Centre will conduct disinfection of the building common areas. Areas within the building covered by the disinfection includes main lobbies, hallways, fire exits, elevator car lifts and lobby area, male and female comfort rooms, machine room, AHU rooms, electrical rooms, and PMO offices.  

The activity will start at around 10am and will be conducted by our service partner, Buildtime Contractors Corporation (Fog2Zero). Estimated time for the disinfection process to cover all the building common areas is around 6pm of the same day. 

The disinfection process will be a combination of wiping of high contact surfaces with disinfectants, UV and steam sterilization, and dry fogging.  

We would also like to remind all of our tenants to conduct their own regular disinfection at their leased area. 

Let us all work together to stop the spread of any disease and maintain our building a safe work place for everyone. 

For any clarification, feel free to call us at (02) 8808-1770.  

 
Thank you.
 
July Pest Control

Dear Tenants,

Please be advised that the monthly pest control activity for the month of July is scheduled on July  9 & 10, 2021.

In connection with this activity, we are requesting assistance to access your office floors. Please see attached corresponding schedules per area.

PMO will oversee the service provider while conducting the said activity.

If the tenant refused treatment upon arrival of technicians despite their confirmation, a mobilization fee of Php 100.00 will be charged to the tenant to cover the cost of labor and transportation.

Furthermore, the Statement of Accounts (SOAs) will be sent to your respective offices on a later date.

 

Kind regards,

GENSET EMISSION TESTING

Dear Tenants,

 

On MondayOctober 14, 2019 from 9:00am to 3:00pm, the building generator units will be operated with no load.

 

This activity is required to give way for the emission testing of the building generator units in compliance to RA 8749 (Philippine Clean Air Act) and pre-requisite in securing PTO (Permit to Operate) for the building generator units.

 During the activity, power supply across the building will still be supplied by the utility (MERALCO). In the event of any disturbance from the normal or utility power, the power will just be transferred automatically from normal to emergency (from MERALCO supplied to generator supplied).

Rest assured that this activity will be closely monitored.

For any clarification, feel free to call us at (02) 8808-1770. 

 

 

Property Management Office

RCBC Savings Bank Corporate Center

25th & 26th St., Bonifacio Global City, Taguig City 

Mobile: +63998 962 2031
Office: 8808-1770

 

 

NDRRMC Earthquake Drill 3Q 2019

Dear Tenants,

 

Please be informed that there will be National Disaster Risk Reduction and Management Council's (NDRMMC) 3rd Quarter Nationwide Simultaneous Earthquake Drill set on Thursday, 08 August 2019, 2PM.

 

RCBC Savings Bank Corporate Center will not conduct a full evacuation drill or sound the alarm. The Property Management Office encourages all of our tenants to perform the "DUCK, COVER & HOLD".

 

For those who will perform the duck, cover and hold, kindly take pictures and send it to our helpdesk email: helpdesk.rsbcc.pmo@gmail.com

 

Please see attached file for our common references.

 

Feel free to call us at (02) 808-1770 for any clarifications.

 

 

Property Management Office

RCBC Savings Bank Corporate Center

25th & 26th St., Bonifacio Global City, Taguig City 

Mobile: +63998 962 2031
Office: 808-1770

 

SECURITY UPGRADE: X-RAY SCANNER AND METAL WALK THROUGH DETECTORS
As part of continuous facilities upgrade, X-ray scanners and Metal Walk Through detectors will be deployed at the main and back lobby of the building by January 2019 to ensure the Safety and Security of building occupants and guests.
 
In this regard, we are asking for your cooperation by the following guidelines:
 
  • For Tenants and building employees, wear your company ID before entering the building.
  • All belongings, except liquid containers must be placed on the XRay Scanner conveyor for scanning upon entry, otherwise access will be denied.
  • After putting all belongings on the Xray machine, he/she must enter through the metal detector.

           Exception: Those with medical conditions that react to the metal detector may inform the guard and the guard will perform manual frisking and guide him/her to the exit lane for his entry.

  • For employees, withdraw the items from the conveyor of the Xray machine and proceed to the elevator lobby.
  • For guests and clients, withdraw the items form the conveyor of the Xray machine and proceed to the reception area for the visitor's pass.
PASSENGER ELEVATOR # 7 USAGE
Please be informed that the Passenger Elevator # 7 is currently under maintenance. 
 
Kindly see attached file for further details and elevator to be utilized while the repair is on-going. 
 
Thank you for your cooperation and understanding. 
 
PA/BGM Testing

Please be informed that PMO Engineering will conduct Public Address / Background Music testing on December 8, 2018 (Saturday) from 9:00am to 5:00pm.

 
Feel free to call us at (02) 808 - 1770 if you have queries.
 
Thank you for your usual cooperation.
 
 
Monthly With Load Test of Genset

Please be informed that RSBCC PMO Engineering will conduct the Monthly WITH LOAD TEST of GENSETS on September 29, 2018 (Saturday). Expect transfer of power from COMMERCIAL MERALCO to EMERGENCY GENSET and vice-versa between 10:00am to 1:00pm.

 

Rest assured that PMO Engineering team will be on top of the activity

 

Thank you for your usual support and cooperation.

Fire Detection and Alarm System Testing,

Please be informed that PMO Engineering will conduct Fire Detection and Alarm System TEsting on September 15 & 16, 2018 (Saturday-Sunday) from 9:00am to 4:00pm

Please expect intermittent sounding of bells and homing of elevators during the activity.

PMO Advisory No. 38.pdf

Gate Pass Application

Please be informed of the following gate pass signing and releasing schedule from Monday to Friday:

 

Signing Cut Off

Releasing Time

1st Batch

10:00am

12:00nn

2nd Batch

2:00pm

5:00pm

Approved gatepass can only be claimed at the specific time mentioned abovr presenting the claim stub issued by the guard on duty. Strictly NO SIGNING OF GATEPASS ON WEEKENDS AND HOLIDAYS.

Gatepass Application.pdf

Designated Smoking Area Re-Opening

Please be informed that TAGUIG CITY LGU (Local Government Unit) already released the outdoor DSA permit of RCBC Savings Bank Corporate Center. Starting July 26, 2018 (Thursday), the Property Management Office is re-opeing the DSA located at 7th Floor Upper podium parking area.

RSBCC PMO ADVISORY 2018-29 DSA.pdf